Page 118 - SAMENA Trends - February-March 2021
P. 118

REGULATORY & POLICY UPDATES  SAMENA TRENDS

        innovation in the telecommunications market” in the Sultanate.   time-to-market at  potentially lower cost. Additionally, it  aids  in
        Besides  enabling  interested  parties  to  test  their  products  and   identifying appropriate consumer protection safeguards to build
        services  in a controlled  manner, the  framework also reduces   into new products and services, it said. (February 16, 2021) omanobserver.om





                                                                                                      Pakistan


        Pakistan Telecommunication Authority (PTA) has conducted an   open-source, full-fledged DRIBS. This system has the ability to
        independent Quality of Service (QoS) survey of GT Road (Lahore   identify all IMEIs latched on Pakistan’s mobile networks and to
        to Peshawar)  and Indus  Highway (Peshawar to Karachi)  from   categorize them based on their compliant status.
        22nd  to  24th  February,  2021,  to  measure  the  performance  of   (March 7, 2021) profit.pakistantoday.com.pk
        Cellular Mobile Operators (CMOs) in terms of mobile coverage,
        service availability and its quality. The survey results reveal that   Ministry of Information  Technology  and Telecommunication
        good 3G coverage is available throughout GT Road, whereas Indus   has approved  seven  projects  worth Rs. 4800 million. These
        Highway has adequate  3G coverage  with patchy  4G coverage.   reviewed  and  modified  projects  were  approved  for  different
        Overall, satisfactory voice, SMS and data services are available on   departments in Departmental Development  Working Party
        both the highways. However, few anomalies have been observed   (DDWP) meeting chaired by Federal Secretary Ministry of IT and
        in voice and SMS QoS parameters of all CMOs throughout GT Road   Telecommunication  Shoaib Ahmad  Siddiqui. These approved
        (from Lahore to Peshawar) and Indus Highway (from Peshawar   projects will not only pave way for fulfilling the Prime Minister’s
        to Karachi). CMOs  have met the 3G and 4G signal strength   Digital  Pakistan  vision but also  ensure training of over 22,000
        and User Data  Throughput  on entire GT Road,  while, on Indus   youths  and create more than 5000 job opportunities besides
        Highway, 3G signal strength of CMOs was found in compliance   provision of broadband  services  on  Karakoram  Highway and
        with license standard, whereas, 4G signal strength was below the   establishing of IT institutions. The meeting was told under one
        license standard. CMOs have been directed to rectify the issues   of the projects Special Communications Organization (SCO), the
        highlighted by PTA, optimize mobile network so as to improve Key   attached department of Ministry of IT, will spend Rs. 1580 million
        Performance Indicators up-to the license standards and also plan   for provision of internet services and mobile connectivity in Diamer
        additional resources/sites throughout the above stated routes. A   Bhasha  dam  site  and  its  surrounding  areas.  The  meeting  also
        confirmatory survey will be conducted upon receipt of compliance   approved project worth Rs. 298 million under which a Technical
        from the licensees. (March 18, 2021) telecoalert.com   Training Center  will  be established in Gilgit.  The meeting  gave
                                                               approval for a project of worth Rs. 651 million for setting up a
        Pakistan  Telecommunication  Authority  (PTA) has said it  has   National Testing Center for 5G Testing under National Information
        issued Mobile Device Manufacturing (MDM) regulations and has   Technology Board (NITB), while Rs. 1944 million was approved
        started receiving applications for mobile device manufacturing. In   for cyber security project. The meeting approved Rs 143 million
        a statement, PTA said that the implementation of the authority’s   for formulation of a Program under Virtual University for bringing
        Device Identification, Registration and Blocking System (DRIBS)   Pakistani degrees to equal level of the degrees of the countries
        in  2019  had  resulted  in  significant  increase  in  legal  import  of   signatory of Seoul accord. The meeting gave approval of Rs. 367
        mobile devices and establishment  of over 33  local assembly   million for National Freelance Training Program. The chair gave
        plants of mobile devices in Pakistan. These plants have produced   direction for timely completion of all projects and in transparent
        over 25 million mobile devices including 4G smartphones since   manner. The meeting was attended by officers of Ministry of IT
        the  implementation  of the  system. The  PTA said that with the   & Telecom, Ministry of Planning, Development, Finance Division,
        successful execution of DRIBS, the local assembly industry had   and others. (March 6, 2021) telecoalert.com
        evolved  from  infancy  to  growing  stage,  with  significant  growth
        seen  in local assembly of smartphones.  In 2019, only  119,639   Pakistan Telecommunication Authority (PTA) has directed Cellular
        smartphones were assembled locally whereas in 2020, the number   Mobile Operators  (CMOs)  to improve network coverage and
        of such devices grew to 2.1 million. It is important to highlight   performance, and maintain Quality of Service (QoS) as per license
        that the end of the second month of 2021, around 1.21 million   standards.  In  view  of public  complaints regarding degradation
        smartphones had been assembled in Pakistan. In the light of the   in service quality  and results of PTA surveys, it  was  observed
        tremendous impact of DRIBS, the government has introduced a   that  lack  of  network  expansion  and  insufficient  network/sites
        comprehensive Mobile  Manufacturing  Policy to encourage  and   are some of the causes of QoS issues. CMOs have been asked
        attract manufacturers to Pakistan and establish their plants. The   to take concrete measures for resolution of root causes, ensure
        PTA has issued MDM regulations and has started receiving mobile   network  stability and adequate coverage  through  expansion  of
        device manufacturing applications. This initiative will help create   their networks, especially in densely populated urban areas. PTA
        more jobs in this technical sector, as well as enable consumers   will review the steps taken by CMOs from time to time to check
        to buy locally manufactured mobile devices. The PTA said that   that improved voice and data services are being extended to the
        the country had the distinction of implementing the world’s first   subscribers. Better coverage and service quality will ensure that

                                                                                                    118   FEB-MAR 2021
   113   114   115   116   117   118   119   120   121   122   123